This week I have been working on the CV system trying to detect two balls when adjacent to each other. I did not think that this would be a problem but the original way my CV program was working it would not detect them. I managed to get it to detect balls when they are next to each other and worked on putting finishing touches on the CV system and the integration with the Projector and the Shot Calculation system. I am currently on schedule and the entire project should be finished in time. Next week, , I hope to finish up all of the testing with Devank and Justin and get all of our deliverables ready as well as doing our demo to TechSpark.