Team Status Report for March 18, 2023

This week was mostly spent by the team working on the group ethics assignment and on our individual parts. All 3 subsystems are making significant progress and we are still on track with our schedule. The only significant risk to the project right now is the stability of the frame to hold the projector and the camera and this week we plan on testing if the frame is able to support the entire system. The contingency plan if the system is not able to support the weight is to add more diagonal stress-bearing elements which would come at the cost of the user interface. No significant design changes were made to the project and we should be getting close to integrating the CV and the shot calculation system by the end of next week, so we are still on track on that front. Everything is proceeding within our expectations.