Team Status Report for 02/25/23

The significant risks that could jeopardize this project is our lack of knowledge about wifi cards and which one to buy. The wifi card component is very important for our project as it will allow us to transfer driver data to the cloud, allowing drivers to keep track of how they’re driving. This will be mitigated with consulting the TAs and anyone else who has experience with wifi cards.

Some changes that were made to the design was adding a head pose estimation system. Eye tracking on driver’s with sunglasses is not feasible and after critiques from the professor in class during the design presentation, we’ve decided to tackle this issue with head pose estimation where the person’s head position would be measured to determine whether they’re distracted/drowsy. This will add an extra week to the schedule and push back our progress by a week. This is being mitigated by the 3 week slack time buffer we had at the very beginning.

Other than adding the head pose estimation code, everything else from the schedule last week looks relatively the same.

Sirisha’s Status Report for 02/25/23

I spent the majority of the time at the beginning of this week working on the design presentation slides.  Specifically, I contributed to almost all of the topics for the slides required in the design presentation guidance page aside from the information that my teammates are more familiar with.  I also helped with the speaker notes so that we’d all be equally familiar with the content of the presentation.  In addition, I did more research into the remaining hardware components we need for the device and had them ordered.  I also continued brainstorming and designing the UI for the web app with Elinora.  We discussed exactly what components we wanted in the web app and what kind of information each page would display.  We already had a few pages planned out from last week, but now we have all of the pages planned out to display the  charts tracking a user’s driving history and feedback and a log of all of the feedback.  I also started doing research into using React.js and created the initial React app.  I also did some more research into how wifi will be integrated into the device in the car, but it’s been a bit challenging so far to exactly figure out how to implement this component.

According to the Gantt chart, by the end of the week, I was supposed to have completed working on the design presentation and initial design documentation, working on the device schematic and part selection, and refining the web app design.  The design presentation was completed, the parts selection have been done, and the web app design is completed as well.  The design documentation has been started, but I think at this stage, there should be a little more fleshed out.  To catch up on this part, I will dedicate more time to it now that my schedule has cleared up more this week.

By next week, the design documentation should be worked on and completed as a team.  We also hope to have all of our hardware components acquired so that we can test them all individually to make sure that they work.  I will also be working with Elinora to start creating the pages in the React app and implementing our UI designs.  I also want to continue figuring out how to incorporate the wifi with the device in the car.

Sirisha’s Status Report for 02/18/23

This week, I worked on researching and ordering the appropriate components for the embedded device and helped with designing the device schematic.  I also started working on the design for the UI of the web app, but after the weekly meeting with our advisor, the plans for the app might need to change depending on how the device will be able to access wifi in the car.  Since our design presentation is next week, I also worked on the slides.  Our progress is mostly on track according to the Gantt chart; however, due to the potential change in plans with how the data will be stored and tracked, we might need longer for designing the UI.  Next week, we hope to have all of our hardware components and aim to test them all individually to make sure they are working, and if not, we will have enough time to purchase more.  I also hope to refine the design for the UI and start work on the design report.

Sirisha’s Status Report for 02/11/23

This past week, I worked on the proposal presentation slides (slides can be found in the proposal section of website) and started doing some more research into the design of our project.  Our progress is on schedule according to the Gantt chart we created.  Next week, my aim is to create our web app’s initial design using Figma and starting with the hardware device’s schematic.