This week I focused on the verification documents for the PCB and the power consumption analysis for the system. The power consumption analysis was completed to the point where the verification documents needed. Further work on the verification documents will be done after some preliminary firmware is written so that we can test bring up software. Next week will be dedicated to firmware and getting estimates on battery life given the power consumption analysis.