This week, I am on track with my planned tasks on the Gantt chart. I finished writing the Matlab testing scripts for ADSR and waveform generation. In addition, the entire team met for a total of around 9 hours this week in finalizing our design, drawing the block diagram, and creating the design review presentation. I think this time was very well spent, because I am now able to get a much better grasp on the project. Next week, I plan to start configuring my local system to enable synthesis and simulation, in accordance with our Gantt chart.