Surbhi’s Status 4/20

Surbhi’s Status 4/20

Accomplishments for Week 13:

Full automation of LED program from Lizzy’s OMR side (MusicXML file and start text file) as well as Vanessa’s side (end text file with performance scores).

Ran user studies with five people for feedback on teaching system. Got varied feedback about complexity during first try but that it gets better with more playing. They would love real-time feedback in the future but are okay with feedback on various measures at the end of the song.

Video of new start screen that waits for two important files to be sent from Lizzy’s side:

Start Screen Demo

Videos of two of those user studies:

User Study 1

User Study 2

Added functionality to display performance score and details on the LEDs after song playing is over:

On schedule

Next week: improve last minute features that are to be ready for Mock Demo next week. Super-glue LED matrices together for better fit on top of piano keyboard.

 

Leave a Reply

Your email address will not be published. Required fields are marked *