Brian Bakerman
Team B1
Individual status report
This week, I worked on understanding how I will be able to interface with our various parts to create a data logging system. I have minimal experience with RFID tags, microcontrollers, and networking, so it was a week of a lot of googling to get up to speed.
Our parts have yet to come in, so I was not able to play around with the integration of the entire system.
Next week, I hope to have our parts such that I can actually get to work on a physical product. Also, there are many parts that we would love to have (like flush valves), so I would like to help us reach out to the toilet industry for some part assistance.
0 Comments