Brian Bakerman

Team B1

Individual status report

This week, I worked on understanding how I will be able to interface with our various parts to create a data logging system. I have minimal experience with RFID tags, microcontrollers, and networking, so it was a week of a lot of googling to get up to speed.

 

Our parts have yet to come in, so I was not able to play around with the integration of the entire system.

 

Next week, I hope to have our parts such that I can actually get to work on a physical product. Also, there are many parts that we would love to have (like flush valves), so I would like to help us reach out to the toilet industry for some part assistance.

Categories: Brian

0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *