Status Report 05-04 (szz)

Individual updates

  • Assisted with FMS parking lot testing
    • Successfully used the system for providing immediate feedback about the effects of experimental traction control features on the vehicle’s performance
  • Assisted with PittRace track testing
    • Again, the system worked well, this time oriented more towards debugging various motor controller faults and providing live battery pack status (voltage, temperature, etc.)

Schedule status

Final wrap-up continues; at this point, additional features are optional “nice-to-haves.” Some effort will also be devoted to extra module assembly and the final report.

Deliverables for 2019 May 11

  • Auto-detection of XBee settings upon boot
    • This requires AT command request/response management in the XBee interfaces
  • Basic Ground Control UI integration