Team Status Report 04-27

Risks

  • Ground control application still remains underway; hopefully, it will be ready in time for the public demonstration, as it is arguably the most interactive part of our system.
  • Bootloader work continues; it looks promising, but requires significant rewriting of the UART driver on the TOM to support wireless reflashing.
  • Rev. 2 assembly will be occurring as soon as the board arrives on Monday.

Design changes

None.

Updated schedule

No updates. See our Gantt chart for more details.

Leave a Reply

Your email address will not be published. Required fields are marked *