This week, I practiced and presented the design review presentation. I also completed peer reviews of design review. Personally, I learned a lot from other group’s design such as detailed hardware design and concrete PCB diagram. I also managed to finish setup on ece-cluster machine. It takes lots of time because I’m having trouble using pip on my afs space as my disk quota is entirely filled. This is a screenshot of my correspondence with ECE ITS Chad to solve this problem. My schedule is on time. For next week, I hope I can deploy the model and start training.