Jong Woo’s Status Report for 10/22/2022

Note: This weekly status report covers any work performed during the week of 10/15 as well as Fall Break

What did you personally accomplish this week on the project? Give files or photos that demonstrate your progress. Prove to the reader that you put sufficient effort into the project over the course of the week (12+ hours): 

         The week before mid-sem break was primarily invested in the crafting and review of the design report. Our team was able to efficiently divide the work loads for the design report based on the subsystems that we were individually working on, and have a thorough and considerate revision to finalize our design report.

          I have spent some time this week, looking into how the vertically and horizontally segmented images would be cropped and stored into a folder of separate file images. Since OpenCV had no specific functions for cropping, “Numpy array slicing” method will be adopted. Since every image files that has been pre-processed can be read in and stored as 2D array for the individual color channels, pixel values of the height and width of the area can be specified to crop specific regions of the images. 

Is your progress on schedule or behind? If you are behind, what actions will be taken to catch up to the project schedule?:

             Progress is on schedule, and given how this past week was a mid-sem break, our team will focus on getting things back rolling and combine the parallelized works, getting ready for the interim demo that is approaching.

What deliverables do you hope to complete in the next week?:

                  Implementation of the canny edge filters along with the non-maximum suppression method for the ultimate edge contrasts will be done. 