Serena's Status Reports

Serena’s Status Report for 11/10/22

This week was spent running tests of our use case requirements. I worked to test the bot’s performance when starting at the edge of a 1.5m radius circle, in which three plastic bottles were placed at random. Through all this Read more…

By sjying, 2 years2 years ago
Weekly Status Reports

Team Status Report for 12/10/22

This week we worked on the final presentation. We also made minor changes to our software pipeline to improve both speed and accuracy. We came up with a major issue with our Realsense depth readings being inaccurate for larger distances, Read more…

By maez, 2 years ago
Mae's Status Reports

Mae’s Status Report for 12/10/22

This week Serena and I made a lot of small adjustments to the pipeline to increase speed and accuracy of the system. Accuracy improvements include putting angle calculation in multitracking. Speed improvements include driving the bot with higher numbers, changing Read more…

By maez, 2 years ago
Meghana's Status Reports

Meghana’s Status Report for 12/10/22

In the beginning of this week we were preparing for final presentations and running enough tests to be able to put baseline metrics on our presentation slides. It was my turn to present, so I spent extra time preparing and Read more…

By mkeeta, 2 years ago
Meghana's Status Reports

Meghana’s Status Report for 12/3/22

These past two weeks I finished the entire hardware and construction for the robot. I mounted the battery with a motor mount and mounted it to the side plank with a motor after measuring out where exactly the connection should Read more…

By sjying, 2 years ago
Weekly Status Reports

Team Status Report for 12/3/22

This week we fully put the robot together. We first created a new back trunk area to hold our batteries, placed all of our components on the lexan plate on the top of the bot, 3D printed a camera stand, Read more…

By sjying, 2 years2 years ago
Serena's Status Reports

Serena’s Status Report for 12/3/22

This week we made a lot of progress testing our system as a whole. Over Thanksgiving break and this past week we put together the entire system on the robot and cleaned it up so that we could do proper Read more…

By sjying, 2 years ago
Mae's Status Reports

Mae’s Status Report for 12/3/22

This week the team put in a lot of effort to integrate our software and hardware into a working system. I wrote the rest of the logic for the software pipeline, including obstacle avoidance and rotation upon not detecting bottles. Read more…

By maez, 2 years ago
Mae's Status Reports

Mae’s Status Report for 11/19/22

This week Serena and I worked extensively to get cuda working with Tamal’s help. We tried many things from flashing Jetpack5 on the Xavier to flashing Jetpack 4.6.1 on the Jetson Nano but could not get a working pytorch with Read more…

By maez, 2 years ago
Weekly Status Reports

Team Status Report for 11/19/22

This week was full of setbacks for our software process. We struggled with setting up the Xavier with Jetpack 5.0 then discovered that it while it allowed us to access CUDA, was difficult to be compatible with the pyrealsense2 library Read more…

By sjying, 2 years ago

Posts navigation

1 2 … 4 Next
Recent Posts
  • Serena’s Status Report for 11/10/22
  • Team Status Report for 12/10/22
  • Mae’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/3/22
Recent Comments
    Archives
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    Categories
    • Mae's Status Reports
    • Meghana's Status Reports
    • Serena's Status Reports
    • Uncategorized
    • Weekly Status Reports
    Meta
    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    • Design Review
    • Final Project Documents
    • Introduction and Project Summary
    • Proposal
    • Weekly Status Reports
    Hestia | Developed by ThemeIsle