This week was a bit rough for team productivity. We started off the week finishing up the design presentation, which was given by Greg on Wednesday. After that, focus shifted back towards the Design Report. We realized one critical area
Greg’s Status Update for 10/10/20
This week, we spent a lot of time working on our requirements, and, as a result, the vast majority of the time I spent on the project this week was joint with Lucas and can be found in our Team
Lucas’s Status Report: 10/10
This week, I mostly spent my time working with Greg on our new requirements list as well as our Design Review Presentation. Discussion of both is covered pretty extensively in this week’s team status report. Both pdf’s are posted on
Team Status Update: 10/10/20
This past week was primarily dedicated towards refining project requirements and better defining our design via system diagrams. We also focused on creating our Design Review Presentation (slides available on the Documents page). Requirements Discussion: The feedback we received from
Greg’s Status Update for 10/3/20
This is my first personal status update for the project, and so I will try to outline all of the work I’ve done on it so far. My capstone experience started out with several different issues regarding course logistics, and
Lucas’s Status Update for 10/3
As the team status report explains, most of the past two weeks have been dedicated almost entirely towards solidifying our MVP design. Together, Greg and I ran through our desired features and decided on how to best achieve them using
Team Status Update for 10/3/20
Hello World! This is our initial status report, roughly one month into the semester. You can click read more below to get the full scoop: