TEAM 4: Air Combo
Spring 2007


ARCHITECTURE

USE CASES (INTERACTION DIAGRAMS)

1. Bootstrapping

2. Tear Down

3. User Gestures

4. User does not gesture

5. Multiple Users

SYSTEM STATES & TRANSITIONS

Risks and Mitigation Strategies

Risks:

1. Identifying different gestures
2. Two accelerometers on one Tmote
- Getting ADC to work
3. Accuracy of accelerometer data
4. IEEE 802.15.4 Interference
5. Handling multiple Data streams from multiple Tmotes

Mitigation Strategies:

1. Limit number of gestures
2. Limit to one accelerometer
3. Correspond user input to procedurally generated music
4. Packet Corruption Detection
5. Limit to one Tmote


Back to the top of this page
18-549 course home page