Leonard’s Status Report for 3/21

This week, the main focus is on the ethical considerations associated with the SPARK system. Worst-case scenario is considered as well as red teaming from other teams.

On the hardware side, additional components have now arrived. However, the PCB has been delayed and is now expected to arrive next week.

In the upcoming week, hardware assembly should begin once the PCB arrives. In parallel, focus should be shifted toward improving the software and testing framework. The plan is to organize smaller group meetings with Tatyana that is dedicated to discuss and develop the code testbenches required for system testing and verification.