Risks
Our models are currently not exhibiting real world behavior closely enough and we plan to improve upon their performance in the coming weeks.
The multi-period solution trajectory is slow to converge and doesn’t show correct behavior for multiple test scenarios, therefore there is a risk that the optimizer has some deep structural issues that may not be solvable within the schedule.
System Changes
We’ve decided upon our basic visual layout for the final webapp. Which will include some sample scenarios (i.e. winy day, cloudy day, etc.) as well as a slider to travel through time. The SUGAR optimization codebase was migrated into a submodule to cleanup the overall file hierarchy.
Schedule Changes
We are mostly on schedule. Integration has taken a bit longer than expected so more work will need to be done next week to improve upon models and visuals