Accomplishments:
- incorporated feedback from proposal presentation into design presentation:
- made a full system block diagram
- made a optimization algorithm process chart
- verified multi-period class interacts correctly with SUGAR3 InfeasabilityAnalysis class during the main DDP loop
Progress Reflection:
- Didn’t meet last week goals because of an update to the battery model by the development team that made me wait until a stable build.
- Need to work closer with development team to understand how to best work on evolving codebase
Next Week’s Goals:
- change slack and SOC variables to class variables in battery class each period and run the inner loop for 2 periods. Then check battery SOC variable from results and verify it correctly changes – it should discharge all in the first period.