Alby’s Status Report for Feb 17

Accomplishments:

  • incorporated feedback from proposal presentation into design presentation:
    • made a full system block diagram
    • made a optimization algorithm process chart
  • verified multi-period class interacts correctly with SUGAR3 InfeasabilityAnalysis class during the main DDP loop

Progress Reflection:

  • Didn’t meet last week goals because of an update to the battery model by the development team that made me wait until a stable build.
  • Need to work closer with development team to understand how to best work on evolving codebase

Next Week’s Goals:

  • change slack and SOC variables to class variables in battery class each period and run the inner loop for 2 periods. Then check battery SOC variable from results and verify it correctly changes – it should discharge all in the first period.