This week I focused on fixing bugs with the system interconnects, designing and running the user validation tests, and implementing a more improved MIDI system. There were some subtle synchronization issues with the serial connections that only made themselves apparent
Team Status Report for 4/30/22
Last week our team hit MVP for our project. We performed initial rounds of verification testing for each subsystem and completed initial rounds of verification testing, which we presented at our final presentation on Monday. This week we wrapped up
Tomas’s Status Report for 4/30/22
I worked this week on the following areas: Finishing CV verification testing Performing user validation testing Improving the CV subsystem Designing and preparing to create a hardware enclosure As part of finishing CV verification testing, I performed contact detection tests.
Min Gun’s Status Report for 4/30/22
For this week, I worked on multiple aspects of our project. First, I validated the rotational data using the glove. In order to perform the test, I developed a way of using Processing to save all the rotational data generated
Harry’s Status Report for 4/24/22
This week I focused on finishing up the integration, validating that the serial protocol works, working on latency testing, and working on the final presentation. I started by fixing the data parsing issue I’d had with the Jetson <-> Due
Team Status Report for 4/23/22
This week, our team’s primary focus was integration and testing. We have made significant progress in these areas, with the glove being fully assembled and three-way communication between the subsystems being established. Furthermore, we have all begun the verification phase
Tomas’s Status Report for 4/23/22
Summary I spent this week working on general areas as our project is coming to a close: Testing the CV subsystem Refining the accuracy and robustness of the CV subsystem Helping to prepare our team’s final presentation Testing the CV
Min Gun’s Status Report for 4/23/22
For this week, I completed multiple tasks including the assembly of the glove and the start of the sensor tests. We had the glove with sensor casings that we 3D printed last week. Since the glove was ready, I soldered
Harry’s Status Report for 4/16/22
This week was spent finishing up the Integration phase and preparing for the final assembly. I spent most of the week working on the three-way communication protocol. I started by upping the baud rate for the Micro <-> Due pipeline
Team Status Report for 4/16/22
This week was largely spent wrapping up the integration phase and preparing for testing. We implemented a three-way serial protocol in which the Due requests sensor data from the Micro, and after receiving said data it requests the ID of