Team’s Status Report for 4/23

After working to integrate the different systems we’ve been working on. We have a complete fully functional system. We integrated the object detection of the cars with the range detection from the LIDAR system, and created a GUI which displays red boxes on the screen relative to the user which indicates the relative direction and range of the cars approaching. Additionally, we tested the GUI with the AR glasses and the system is working end to end. Next, we will be testing the system to collect data on the accuracy of prediction and the speed at which it can warn the user.

Shown above: for the sake of testing, we configured the YOLO algorithm to detect people instead of cars. The camera is detecting a person in the frame and figuring out the range to the object, and displays the warning as a red square. The system can detect and display multiple objects at once, and will only display a warning if an object of interest is detected by the camera. For example, if a chair is in range of the LIDAR, the system will not warn the user because it is not an object of interest.

Team Status Report for 4/10/22

As a team, we are trying our hardest to ensure the delivery of our project. The most significant risk right now is the camera still not working. As we have reflashed the jetson and are using some new libraries, we hope it should be working soon but there are definitely some hardware limitations when it comes to running the YOLO algorithm. This is being managed as we are working on other aspects of the project and ensuring those are working such that when the camera is figured out, we can move swimmingly. If it does not work on the Jetson, we were thinking of switching to a RPi to see if the space and CPU there could handle what we have.

No changes as of right now to the design of the system.

We did update the Gaant chart and schedule to account for the delay with the camera.

Fayyaz Status Report for 4/10/22

This past week I was helping with a few things but due to carnival and the demo, nothing incredibly substantial. After the failures with the camera on one of the Jetsons, this week I worked on reflashing the device. This was different than previous as this time I was trying to see if there were settings or libraries install earlier in setup that could have contributed to the disfunction of the Yolo algorithm. After consideration, I decided to only flash and do the base setup to ensure nothing could be done. This was done and it seems there have made some progress with the new algorithm.

Besides this, I have written a basic script for the two jetsons to talk with one another and hope to implement it when both jetsons are done with their individual components.

My progress is a bit behind as it depends on both the camera and Lidar working which is not the case right now.  As this is the case, I hope to come in and work with chad to see what we could to speed up the camera process and ensure there is something that we can work with soon.

In the next week, I hope to deliver the new script I created as well as a basic design (again) of our cage to house the components.

Fayyaz Status Report for 4/2

This past week I transitioned to working on two main components. The first being the design of the project. After looking at the individual designs of each of the different aspects of the project, I came to realization that maybe using two jetsons would be better than one. After discussing with the group, we thought this idea would be great. From here, I started looking to the physical components that could house all the parts of the project. I decided to looking in to some 3d modeling programs to design it.

More importantly, after deciding on using two Jetsons instead of one, I was trying to figure out how to have both jetsons talk to one another. After talking with the professor, he mentioned to use Ethernet. I did some research and found this website as a reference: https://youtu.be/VbuHzujRcNo . After the others are done setting up their work more and focusing on other aspects, I hope to focus on this.

I think my progress is on schedule. There is a bit more work now but, I think we are still on track.

Over the next week, I hope to implement the jetson communication and have some base physical design to present.

This week I mostly worked on researching the components for the LIDAR for our system. We ordered our Parts on Wednesday. Last week was mostly working on researching the components for the project, next week once our parts are ordered we will start researching the implementation of our design.