Week of Apr 14 – Apr 20 Administrivia Made preparations for the in lab demo on Monday. Project I did a lot this past week in order to catch up fro the week I did not too much before (build
Bujji’s Status Report: Week 8
Week of Apr 7 – Apr 13 Administrivia N/a Project Worked on other things (as part of the schedule for build week). Thought about how to make the IR better, as well as ways to improve on the RFID. Scheduling
Team Status Report: Week 8
Risks and Contingencies No new risks were identified this week Changes to Design No changes to design were made this week Schedule Update This week Bujji and Sourav did not have tasks scheduled due to Booth but both were slightly
David’s Status Report: Week 8
Progress Wrote unit tests for game progress logic, testing that calling methods for scanning gates causes the game state to progress and change players’ places and items. Integrated item models with game logic and animations by writing classes for items
Sourav’s Status Report: Week 7
Progress This past week I mainly focused on getting my parts of the project prepared for the mid- point demo. The previous week I had finished the functionality to set the rpm and incomplete steering support. This week I worked
David’s Status Report: Week 7
Progress This week our priority was preparing for the interim demo. For me, this meant integrating the PC controller software with the motor driver on the pi, creating a demo version of the game application by removing matchmaking and network
Team Status Report: Week 7
Risks and Contingencies The RFID latency is an issue we must solve. We are looking into either improving the size of our tags or finding a higher performance RFID reader. Shakiness of the camera feed is an issue. We are
Bujji’s Status Report: Week 7
Week of Mar 30 – Apr 6 Administrivia Worked to to put together a cohesive product to demo for the mid-point demo on Wednesday. Had to remake our schedule for the mid-point demo. Worked on the reading assignment dues this
Sourav’s Status Report: Week 6
Progress This past week I was focused on completing tasks relating to having the car fully functionally for movement by the mid-point demo this coming Tuesday. I completed the encoder reading and feedback loop control for the motors that I
Team Status Report: Week 6
Risks and Contingencies The RFID latency is still an issue, but it is something we have decided to address to after the midpoint demo on Wednesday. Latency on the video doesn’t seem to be optimizable at all. With basic Vuforia,