Week of May 5 – May 11 Administrivia Prepared the final report Prepared for the final demo Cleaned up our lab space
David’s Status Report: Week 11
Progress Worked on final presentation slides and prepared for presentation. Worked on poster. Got a router from Professor Nace and changed network connections (pc-pc, pc-pi video and control) to use LAN instead of internet. This should hopefully help with latency
Team Status Report: Week 11
Risks and Contingencies The IR receivers are sensitive to sunlight, so too much sunlight in our demo space on Monday may cause the cars to receive false hits. We are going to cover the sides of the IR LEDs on
Bujji’s Status Report: Week 11
Week of Apr 28 – May 4 Administrivia N/a Project This week I was able to complete most of the tasks I had said I was going to do last week: Fix the IR circuits to have pull down resistors