Week of Mar 30 – Apr 6
Administrivia
- Worked to to put together a cohesive product to demo for the mid-point demo on Wednesday.
- Had to remake our schedule for the mid-point demo.
- Worked on the reading assignment dues this Sunday
Project
This week I worked on a few different things to help get the project ready for our midpoint demo in two weeks:
- Motors: Helped Sourav with the motor drivers by trying to look through his code to get the car to drive straight.
- Looked into finding a higher performance RFID scanner to fix our issues with the gates.
Scheduling
I have caught up on my tasks. before I was behind, but I did a lot more this week so I should be on track now.
New Schedule | |
Dates | Task |
Feb 4 – Feb 6 | Come up with a first draft of the bill of materials for three cars |
Feb 6 – Feb 8 | Started design of RFID and IR circuits |
Feb 8 – Feb 15 | Started design the physical layout of a car |
Feb 15 – Feb 22 | Finish first draft of circuit designs |
Feb 22 – Feb 25 | Design the PCB that goes in the car |
Feb 25 – Feb 28 | Find appropriate battery and power system parts |
Feb 28 – Mar 3 | Work on preparing for the design review presentation and report |
Mar 3 – Mar 9 | Finish first draft of 3D model for the car |
Mar 17 – Mar 19 | Assemble frame. |
Mar 19 – Mar 25 | Build IR circuits, get started on RFID and Xbox controller and assemble 2 cars. |
Mar 25 – Mar 31 | Finish the IR circuits so that they are mountable and work on Xbox controller inputs. Also, prepare for midpoint demo. |
Mar 31 – Apr 4 | Optimize the RFID scanner, make third car. |
Apr 4 – Apr 9 | Optimize the RFID scanner, make third car. |
Deliverables for Next Week:
- Next week is build week, so I will not have anything to deliver for capstone.