Team’s status report for 11/7

This week, the team made significant progress on the RESQUBE localization tuning and accuracy measurements, as well as continuing progress on the Rover’s construction. Due to issues with the existing mesh and localization setup, significant changes had to be made to the RESQUBE node code to allow for successful, and accurate victim localization. Additionally, we are encountering two main issues with the Rover that need to be fixed next week. The first issue is that there is a ground loop in the Rover circuitry that threatens to damage the Pico. This is because, if motors accelerating or braking causes a voltage spike, there is a chance that the state of the ground jumps above 0V, which will overload the voltage entering the Pico and fry it. This can possibly be solved using chassis grounds, and connecting every PCB’s ground to the chassis to prevent ground loops. The second issue is that the I2C bus is being corrupted by the readings from the IMU. When polled, the IMU occasionally returns garbage data of the form 0xFEFE, that breaks the program. There are two mitigations. First, we need to make the program rely on timeouts for each command, so that no single command can stall the program indefinitely. Second, we need to potentially move the IMU off of the same I2C bus as the motor driver board, so that we can transmit without fear of collisions, in case that is the issue. However, further research and investigation has to be conducted into that area. We are well into integration now, and we remain on schedule.

Raghav Srinivasan’s Status Report for 11/7/2026

This week, I focused on rover construction, odometry, and calibration. What I did this week was complete the soldering of the wiring harness for the I2C bus for connecting the Raspberry Pi Pico to the MPU6050 IMU and the HiWonder 4 Channel Encoder Motor Driver. I also completed the connection, using XT60 cables, for power to the Jetson Orin Nano, so we no longer had to use it connected to the wall. Finally, I used standoffs and screws to mount the hardware on the top plate to the motor driver, battery, and buck converter on the bottom plate to complete the basic rover assembly.

With regard to the odometry and calibration, I developed and tuned a complex control algorithm that blended data from the IMU and encoders at variable rates depending on the type of movement that was occurring, and then used sequential PID controllers to ensure the rover got to its destination properly. The code also implements a command line style interface for the Jetson and human operators to interact through, offering movement commands like MOVE x y for moving forward x meters at y meters per second, and TURN x, for turning x degrees counterclockwise, as well as diagnostic commands like CALIB? and STATE? for dumping the current calibration and for dumping the current position and heading respectively. With this setup, the Pico alone was able to achieve +- 5 cm accuracy in MOVE commands, and +- 5 degree accuracy in TURN commands. However, I2C bus issues are occurring, harming the reliability of the program, especially when connected to the Jetson, so our next step is to solve these integration issues.

With regard to the schedule, I am on track, though, if this integration issue takes too long to solve, that could change.

Team’s status report for 10/31

This week, the team made significant progress on the rover’s physical construction, RESQUBE development, and firefighter base station software. Due to further delays with our original chassis order, we transitioned to an alternative tracked chassis and began integrating the power and motor control systems. This required modifications to the rover CAD, mounting interfaces, and odometry implementation. Meanwhile, the firefighter base station’s initial interface was developed, including live mapping, telemetry, subsystem status, and victim alerts. RESQUBE localization testing also continued, with all three nodes and their enclosures now available for integration.

Our primary challenges this week were adapting to the new chassis and delays in setting up the Jetson software environment, which pushed back some navigation and localization testing. However, work on the hardware and software has continued in parallel to minimize the impact on our schedule. Next week, we plan to focus on rover integration, completing the Jetson setup, testing odometry and localization, and connecting the RESQUBE network to the base station. Despite these setbacks, the team remains on schedule.

Ishaan Verma’s Status Report for 10/31/2026

This week, with the news that the person handling our chassis order had left until April we had to explore new options for our solution. Luckily, Quinn was able to provide us with a new treaded chassis with its own motor controller, encoder motors, and similar form factor.

New Chassis

However, this new form factor did put us behind on the CADs for the chassis and RESQube dispenser. As such, that was my primary focus for this week with less time allocated to the testing of localization. A new chassis interface for mounting the rover parts onto the chassis was fully CAD’d and 3D printed, with more agnostic design used to be able to fit with any future design iterations.

Partial interface between Jetson and Chassis with attachment plate for LiDAR

In addition to this, because of now having a provided chassis the budget allowed for new solutions to be considered. In particular, more space has been allocated for the sensor stack and potential additional sensors to assist in navigation, hazard mapping, and SLAM. Odometry’s implementation also had to be altered due to the new motors and different dimensions of the rover. With these changes and my progress, I am on track according to the project schedule thanks to having tasks in advance, with odometry now being my primary deliverable and RSSI validation after it. Integration should also have started by next week.

Mehaan’s status report for 10/31

This week I began working on the firefighter base station. I developed the initial interface, which includes the live map display, rover/RESQUBE status, telemetry, and victim alerts. I am on schedule with software development. The pending work includes physical rover integration, and live network telemetry. Next week will be integrating with the network, and begin testing with that.

Raghav Srinivasan’s Status Report for 10/31/2026

This week, we received the bad news that our original Waveshare chassis wouldn’t arrive on time due to the Waveshare representative being off on vacation. The good news was that Quinn had a free spare chassis that was nearly identical. Therefore, I got to work soldering together the power and motor control systems, connecting it to the chassis, and testing and calibrating the motors with an Arduino UNO, as a temporary microcontroller before we switch to our official ESP32 chassis subsystem board. Additionally, I got the m.2 drive necessary for the Jetson Orin Nano, but then realized that the monitor that I intended to use for the installation process was an ultrawide monitor, and thus did not support the Jetson. So installation of the OS and ROS2 is yet to occur. Additionally, I continued work on the RESQUBES, with localization testing beginning. Further testing needs to occur in that area, and in the three node mesh network system, as I was able to receive the third node from Ishaan, along with the 3D printed enclosures to finish off the construction of the RESQUBES. I am currently slightly behind on the RESQUBE front, but mostly because I chose to take on a lot of the rover construction and testing efforts. So overall, we are still on schedule.

Ishaan Verma’s Status Report for 10/24/2026

This week, I began working on the odometry for the RESQ rover and finishing up the CAD for the rover. The RESQube CAD was fully finished and new iterations were printed and are ready for assembly. In addition the rover CAD was fully completed, however the assembly has not been validated due to delays in the shipping of the chassis. The delay, however, should not significantly affect our timeline for the integration stages. The CAD for the RESQube dropper is also near completion, with testing also contingent on delivery of the solenoid. In addition, for the RSSI victim localization, I have created benchmarking test procedures to better get characteristics based on real world conditions to better characterize our performance. The practical application for the RSSI as well has been worked on and is close to completion. Odometry progress is also going well, with validation for odometry being waited on contingent on the chassis delivery. I am currently on track for the schedule, but need to take some precautionary effort in developing test procedures to be more negligent of delivery hold ups. For the upcoming week I hope to finish the odometry fully, have printed examples of the rover chassis with partial assembly with the Jetson to ensure I am ahead of schedule, and assist in the completion of the RSSI localization.

Raghav Srinivasan’s Status Report for 10/24/2026

This week, I began working on the RSSI localization software for the RESQUBE subsystems. I have already generated some untested code, and have begun to work through some of the bugs and issues. I have gotten a single node to perform distance calculations, but it hasn’t been calibrated to the specific sensor found on the SEEED XIAO. Additionally, calibration will have to be redone when the 3D printed enclosure is finished, as it has the potential to attenuate the signals slightly, which will reduce the accuracy of the calibration. My next steps for next week are to calibrate the values for the RSSI calculation for each RESQUBE node, test the localization accuracy with 1 node, 2 nodes, and the full 3 nodes, and to determine if the victim coordinates are being relayed across the network such that a host connected to the mesh (which will later be the first responder tablet) can see the data. I also need to continue testing of the mesh communications with three nodes, as tests have only gone upto two nodes so far. I am currently on or slightly ahead of schedule, as I have finished the mesh communications and preliminary testing, and have moved onto the localization portion of the subsystem.

Team’s status report for 10/24

This week we completed the testing on our RESQUBE mesh network and the Rover CAD, and made significant progress on the RSSI implementation and navigation software. Additionally, odometry is also nearing completion and needs integration into the main rover stack. The main risk to our schedule is the delayed arrival of our chassis, which has pushed back physical rover integration. Software dev has continued in parallel to mitigate any major risks posed by this delay. No major system level changes were made this week. We aim to cover up for the chassis delay this coming week, and stay on schedule for the remainder of the semester.

Mehaan’s Status Report for 10/24

This week, I continued development of the rover navigation software, which is close to completion (few nav2 and ros2 integration bits left). Will begin testing on the physical hardware in the coming week. In terms of rover integration and assembly, I am slightly behind since the rover has not arrived yet. It is scheduled to arrive next week, and I plan to make up the lost integration time then. Other than this, everything else is on schedule and once integration is done, I plan to start working on the firefighter interface next weekend.