- What are the most significant risks that could jeopardize the success of the
project? How are these risks being managed? What contingency plans are ready?
Primary risks include Model accuracy, environment control, and speed/user experience. We are planning to try to manage accuracy by experimenting with a few models and by using a composition of models if needed. The environment control is something that we will working on when prototyping the hardware and our physical system. We make a protocol for keeping the environment consistent. User experience and speed will be monitored as we get into the later stages of development.
2. Were any changes made to the existing design of the system (requirements,
block diagram, system spec, etc)? Why was this change necessary, what costs
does the change incur, and how will these costs be mitigated going forward?
No changes at this moment.
3. Provide an updated schedule if changes have occurred.
No Schedule changes at this time.
4.This is also the place to put some photos of your progress or to brag about a
component you got working.
We don’t have many physical updates at this time but they certainly will be included in the next report. The majority of our work this week surrounded prep for and rehearsing our presentation.