Team Status Report 11/30/24

Summary of Progress:

This week, the team focused on testing and verification as well as making final adjustments to the product. Our primary tasks included:

  • Performance Testing:
    • Measured system latency, moving speed, and force accuracy.
    • Verified that all results meet the user case requirements, ensuring the system performs as intended.
  • Controller Adjustments:
    • Developed a new controller frame designed to enclose all cables neatly.
    • Improved ergonomics, making the controller easier to grasp and operate.

The final results of these tests and adjustments will be presented during next week’s presentation.

Key Achievements:

  • Verified system performance, confirming that all metrics align with the user case requirements.
  • Successfully redesigned the controller frame for improved usability and organization.

Next Steps:

  • Finalize the presentation, including detailed testing results.
  • Prepare for the upcoming demo, ensuring all components are fully operational and presentation materials are ready.

Risks and Mitigations:

  • Risk: Limited time for final presentation preparation.
    • Mitigation: All testing and adjustments have been completed, allowing us to dedicate the remaining time to finalizing the presentation and polishing the product.