Our most present issue was the fact that by Monday’s meeting, we were still fairly unsure of some of our MVPs, and we had a lot of maybes in what we wanted to do. Additionally, we still hadn’t thought about many situations and edge cases, such as how we were going to go through the process of connecting our device to Wifi as well as what our UI was going to look like.
We made some changes to our design. After meeting with Prof. Theo on Monday, we decided that we need to scope down our MVP. We ultimately decided that we will continue to implement PDR for outdoor tracking however we decided to scope down from including indoor tracking as we would rather have one component working very well rather than two components kind of working, because we are still implementing PDR for outdoor we do still have the ability to implement indoor tracking if time allows however it is no longer a part of our MVP. Additionally, we figured out what we want our UI to look like, and we decided that we want to implement both a friends list and a random list, which was still open for a bit.
Our testing plan and schedule remain the same because we still need all the components we used for indoor testing for outdoor testing as well.
