Chris Oh’s Status Report for March 28

This week I focused on integrating the software and hardware components of the system and stabilizing the end-to-end pipeline. The main effort involved connecting the playback and visualization software to the hardware layer, debugging integration issues, and resolving errors encountered during real-world execution. In parallel, I worked on fully integrating the OMR pipeline with the conversion layer and began addressing a Java-side error affecting OMR processing.

Software and Hardware Integration

  • Integrated the playback and visualization software with the hardware layer to enable end-to-end system execution.
  • Verified that processed musical events are correctly transmitted to the hardware during playback.
  • Encountered intermittent failures and runtime errors during integration, primarily due to timing, data formatting, and interface mismatches.
    Spent time debugging and resolving these issues to improve system stability and reliability.
  • Continued iterative testing to ensure that software-hardware communication behaves consistently during playback.

OMR and Conversion Layer Integration

  • Fully integrated the OMR pipeline with the conversion layer, enabling direct flow from sheet music input to processed musical events.
  • Verified that OMR outputs are correctly parsed and transformed into the system’s internal event representation.
  • Encountered a Java-related error within the OMR pipeline that affects certain inputs.
  • Began debugging the Java error and investigating its root cause to restore reliable OMR processing.

Schedule

I am currently on schedule. While integration exposed several failures and errors, this work is expected at this stage and is helping stabilize the system. Progress continues toward a fully integrated end-to-end pipeline.

Deliverables for Next Week

  • Resolve remaining software-hardware integration errors and improve system robustness.
  • Fix the Java error in the OMR pipeline and verify reliable sheet music processing.
  • Continue end-to-end testing from OMR input through playback and visualization.
  • Begin performance and stability testing under different tempos and input conditions.