Aiden’s Status Report for 4/25

What did I accomplish?

I built another linear axis for the pitch gantry and achieved simultaneous 2-axis movement, and hypothesized different solutions to frame it. I decided that, given the spatial constraints and minimal time left, the XY gantry was unfeasible. I instead developed and sourced components for another gantry enhancement — the retractable Z magnet. I also iterated on the gantry control with Bing to enable variable pitch speed and a button interface.

 

Am I on schedule or behind?

I’m behind schedule. I hoped we would have had more time fully integrated and testing at this point.

 

What do I hope to complete in the next week?

Everything. I hope to produce a system that is robust, skill-based, engaging, aesthetically pleasing, and, most importantly, fun.

Leave a Reply

Your email address will not be published. Required fields are marked *