Sara’s Weekly Update (March 22, 2025)
We are caught up with the physical build. The robot is currently designed for testing: a detachable platform to test for slop climbing, and a small linear actuator (LA) for platform testing. I drilled the L brackets onto the platform and the LA onto the board. I also completed the rest of the motor controllers … Continue reading Sara’s Weekly Update (March 22, 2025)
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed