Team Status Report for 4/6

Risk Identification and Mitigation Strategies
Primary Risk Concern: Our primary concern currently is being able to integrate our modules together, especially the camera and the scanner module. This includes not only the coding part, but also physically putting them together. As the scanner will be apart from the rbpi module and connected via wire, we will have to see how we can put them together without making it difficult for our users.

Mitigation Measures:
We are able to tweak our physical design part of the scanner if needed. The wiring part can be extended or shortened if necessary. Other mitigation measures and validation methods will be discussed in Validation section.

Project Design Updates
As of the current reporting period, there have been no modifications to the initial design of the project.

Validation

For validation, our main aspect is putting the modules all together and seeing if they work as intended at the specs that we want. Specifically, we want to measure how fast our scanner system works, and how accurate the information is, and how easy it would be to fix any mistakes and log them into our system. These metrics will be validated by testing our module in a real life setting. We will setup our scanner module as well as our central module in a room, and try to do a test run of a real life scenario. This includes scanning, logging, and checking information. We will then debug any issues that may arise in the process, such as timing requirements as well as accuracy requirements.

Schedule and Timeline
We are on schedule, and hope to be done integrating by next week. We will dedicate the rest of the time on testing and validating our module.