Team Status 3/25

  • What are the most significant risks that could jeopardize the success of theproject? How are these risks being managed? What contingency plans are ready?
    • The risks remain the same as last week and they are being managed the same
  • Were any changes made to the existing design of the system (requirements,block diagram, system spec, etc)? Why was this change necessary, what costsdoes the change incur, and how will these costs be mitigated going forward?
    • No changes were made
  • Provide an updated schedule if changes have occurred.
    • No changes