Team Status Report For March 25th, 2023

This Week was Really Good in terms of progress for the team. Devank finished a preliminary bug-free shot calculation that can find the optimal shot given a random game state. Jimmy got the CV system to work and is able to detect pool balls and differentiate them with solids and stripes. Justin is finishing up a lot of the smart embedded cue stick and is almost done having the Arduinos on the pool table and the cue stick communicate with each other. The only significant risk to the progress of the team is the troubles that might come with the integration of all three sub-systems and to minimize this we have extensively discussed failure cases and how to get over them. Although one of the systems is a little behind on progress, we should still be in good shape to finish on time and will have to compensate for it in the upcoming week. No Changes have been made to the design of the systems either.



Leave a Reply

Your email address will not be published. Required fields are marked *