Team’s Status Report 2/25

Most of this week was dedicated to flushing out issues brought up in our design presentation as well as working on the design report. There were a few holes in the hardware that needed to be addressed, specifically regarding how the pen would be calibrated. We have narrowed it down to two potential methods: requiring a calibration stage that places the pen on the ground or requiring another static device that doesn’t move to serve as a reference point. We want to discuss more during our meeting to see which one may be better.

We have adjusted team assignments so that Anthony will be assisting Sophia with hardware more so in the beginning. There are a lot of areas that need to be flushed out more fully so having two people will hopefully make the design more robust and created more quickly, which is a necessity due to the software depending on the hardware.