This week I primarily worked on the Design Review Report. This was helpful in forcing me to think even more about our design. I also placed the order for our batteries as well as the fabrics we are going to put the device on this week. Outside of the design report, I wasn’t able to get much done because I am still waiting for the parts to arrive. I am starting to get pretty concerned about this. I am not sure that we have any back up plans for if the parts take much longer to arrive. Finishing this up at the end of spring break, they are still not in, so we will begin reaching out to the appropriate resources and potentially looking at ordering from a different vendor with rush shipping on Monday. We are falling behind schedule, but this week I will work on connecting the arduinos to the web app as we don’t have the IMU’s yet, which will let us get rid of some interfacing time at the end(hopefully).