This week, I helped with the design review presentation and began work on the design review report. I also assisted Samuel in the training and fixing of the neural network for classification.

I was not able to start the API integration, as the endpoints aren’t ready yet, so I fell slightly behind schedule. However, the API is being built in a much more sustainable way, so making these early sacrifices will save us lots of debugging headaches down the line.

Next week, I will hopefully begin work on integrating the code with the API endpoints, as soon as those are ready.