Team E6, Carnegie Mellon ECE Capstone, Spring 2020

  • Weekly Status Reports
  • Introduction and Project Summary
  • Final Project Report
  • Design Review and Document
  • Demo Video
  • Proposal Presentation Slides

yuxiaoc

Yuxiao's status report

Yuxiao’s Status Update for 02/22/2020

Accomplishments this week 1.Change M2 from stepper motor to servo When searching for appropriate M2, the limited torque M1 can bring is my big consideration. A searched for many stepper motor models, but all has large dimension (around 40mm * 40mm) and large weight  (around 350g). In order to flip Read more…

By yuxiaoc, 5 years5 years ago
Yuxiao's status report

Yuxiao’s Status Update for 02/15/2020

Accomplishment this week: 1. Design of mechanical system For the mechanical flipper, M1 needs to have high power to flip the shaft and motor, M2 need to be very light weighted to make the flipping easier for M1. M3 needs to be small to fit between M1 and the music Read more…

By yuxiaoc, 5 years5 years ago

Posts navigation

Previous 1 2
Recent Posts
  • Team Status Report for 05/02/2020
  • Yuxiao’s Status Update for 05/02/2020
  • Qingyi’s Status Update for 05/02/2020
  • Jiameng’s Status Update for 05/02/2020
  • Team Status Report for 04/25/2020
Recent Comments
    Archives
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    Categories
    • Jiameng's status report
    • Qingyi's status report
    • status report
    • Uncategorized
    • Yuxiao's status report
    Meta
    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    • Weekly Status Reports
    • Introduction and Project Summary
    • Final Project Report
    • Design Review and Document
    • Demo Video
    • Proposal Presentation Slides
    Hestia | Developed by ThemeIsle