Bujji’s Status Report: Week 12

Week of May 5 – May 11 Administrivia Prepared the final report Prepared for the final demo Cleaned up our lab space

rselagam May 11, 2019 Bujji's Reports No Comments Read more

David’s Status Report: Week 11

Progress Worked on final presentation slides and prepared for presentation. Worked on poster. Got a router from Professor Nace and changed network connections (pc-pc, pc-pi video and control) to use LAN instead of internet. This should hopefully help with latency

dzy May 4, 2019 David's Reports No Comments Read more

Team Status Report: Week 11

Risks and Contingencies The IR receivers are sensitive to sunlight, so too much sunlight in our demo space on Monday may cause the cars to receive false hits. We are going to cover the sides of the IR LEDs on

rselagam May 4, 2019May 4, 2019 Team Reports No Comments Read more

Bujji’s Status Report: Week 11

Week of Apr 28 – May 4 Administrivia N/a Project This week I was able to complete most of the tasks I had said I was going to do last week: Fix the IR circuits to have pull down resistors

rselagam May 4, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 10

Risks and Contingencies Latency of the video stream and control spikes frequently when there are many people connected to the router. A possible solution would be to use our own router for a network with only our devices connected, but

dzy April 27, 2019 Team Reports No Comments Read more

David’s Status Report: Week 10

Progress This week we prepared for the in-lab demo and final presentation and made our poster. For the in-lab demo I worked with my team to test and connect the pis and pcs to complete the game. Schedule I finished

dzy April 27, 2019April 27, 2019 David's Reports No Comments Read more

Bujji’s Status Report: Week 10

Week of Apr 21 – Apr 27 Administrivia Had our in lab demo on Wednesday where we showed most of our system works (RFID, car to car one-way IR blast, gameplay and item usage). Spent most of Saturday working on

rselagam April 27, 2019April 27, 2019 Bujji's Reports No Comments Read more

Sourav’s Status Report Week 9

Progress This week, upon realizing intrinsic issues in a python implementation of time-sensitive control, I ported all of the work I had completed over the course of the semester from Python into C. I was also able to research the

souravp April 20, 2019 Sourav's Reports No Comments Read more

David’s Status Report: Week 9

Progress This week was meant to be the first week of integration, but we fell slightly behind schedule as a group so I worked to prepare us for integration. Further refined the game component by testing entire game. To test

dzy April 20, 2019April 20, 2019 David's Reports No Comments Read more

Team Status Report: Week 9

Risks and Contingencies No new risks were identified this week Changes to Design The game now requires user to slow down when passing over gates. We realize that this isn’t the best feature, but it seems to be the only

rselagam April 20, 2019 Team Reports No Comments Read more
  • « Previous

Categories

  • Bujji's Reports
  • David's Reports
  • Sourav's Reports
  • Team Reports
  • Uncategorized

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
Copyright © 2025 ARio Kart. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.