Sourav’s Status Report: Week 6

Progress This past week I was focused on completing tasks relating to having the car fully functionally for movement by the mid-point demo this coming Tuesday. I completed the encoder reading and feedback loop control for the motors that I

souravp March 31, 2019 Sourav's Reports No Comments Read more

Team Status Report: Week 6

Risks and Contingencies The RFID latency is still an issue, but it is something we have decided to address to after the midpoint demo on Wednesday. Latency on the video doesn’t seem to be optimizable at all. With basic Vuforia,

rselagam March 30, 2019 Team Reports No Comments Read more

David’s Status Report: Week 6

Progress This week I worked on tasks related to preparing for the interim demo on Wednesday, namely, the video stream latency optimization and controller integration. For the latency optimization, the first thing I did was figure out how to measure

dzy March 30, 2019 David's Reports No Comments Read more

Bujji’s Status Report: Week 6

Week of Mar 23 – Mar 30 Administrivia Had to work on and turn in the second ethics assignment. Project This week I worked on a few different things to help get the project ready for our midpoint demo next

rselagam March 30, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 5

Risks and Contingencies Realized that the RFID scanner we got may not be fast enough. Might not have enough GPIO pins on the rpi to be able to do everything we want to do. As a possible solution, we can

rselagam March 24, 2019 Team Reports No Comments Read more

Sourav’s Status Report: Week 5

Progress This week I spent most of my time working on the motor driver. After a small setback of losing the code for the motor PWM module, I re-wrote it and began work on the encoder module. First I began

souravp March 23, 2019 Sourav's Reports No Comments Read more

David’s Status Report: Week 5

Progress Implemented video streaming from pi to unity on pc, which included writing a script in Python on the pi to connect to the pi matchmaking server and set up a socket server for the video stream, and finishing up

dzy March 23, 2019 David's Reports No Comments Read more

Bujji’s Status Report: Week 5

Week of Mar 16 – Mar 23 Administrivia None. Project This week I worked on a few different things to help get the project ready for our midpoint demo in two weeks: RFID: Found a good library that wrote the

rselagam March 23, 2019March 23, 2019 Bujji's Reports No Comments Read more

Sourav’s Status Report: Week 4

Progress This week I spent several hours working on both the Design Report and the Ethics deliverable 1. This took up the majority of my time this week, and I was quite busy with my other classes as it was

souravp March 10, 2019 Sourav's Reports No Comments Read more

David’s Status Report: Week 4

Progress Early in the week I spent several hours on the design report and ethics assignment and later worked on familiarizing myself with Unity Multiplayer and settting up the network infrastructure for matchmaking between pcs and between pcs and pis.

dzy March 9, 2019March 25, 2019 David's Reports No Comments Read more
  • « Previous

Categories

  • Bujji's Reports
  • David's Reports
  • Sourav's Reports
  • Team Reports
  • Uncategorized

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
Copyright © 2025 ARio Kart. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.