Leon’s Status Update for 11/22

Leon’s Status Update for 11/22

Tasks Accomplished

  • Finished part iteration of the display module, as well as the design of the battery and compute module. The design now takes a smaller footprint, if we have enough time to spare one more stepping, I can further distribute the parts in the battery/computer module but that seems unlikely as of now
  • Fabricated the display module and battery/compute modules
      • Much higher resolution than previous print, used the form printers this time around
      • Had to start a makeshift isopropyl alcohol washing setup since the parts were not properly washed on pickup
      • Also had to create a makeshift UV curing station since there was not enough sunlight to cure the parts quickly


Deliverables for upcoming week

  • Assembling the finished product (barring any hickups with the current design iteration).
  • Hooking up and running some tests on the battery/compute module.
  • Improving OLED API, adding extra degrees of accuracy (i.e. 30 degree arrow steps vs the current 45 degree)