Will’s Status Update for 10/11

Will’s Status Update for 10/11

  1. Performed current/power calculations for determining the battery
  2. Finalized BOM with team together
  3. Worked and codified design and slides with rest of team
  4. Investigated osxAcousticSL library interfaces

Leave a Reply

Your email address will not be published. Required fields are marked *