Leon’s Status Update for 10/11
Tasks Accomplished
- Completed BOM with team, delivered to instructors for review (will be included in the team update)
- Hardware block diagrams for system architecture design. Describes the specific hardware we are targeting in our system, as well as the interfacing between the modular components
- Completed a first pass CAD design (version 0001a). The design is not yet modularized (i.e. everything is in the same part instead of multiple parts in an assembly), and does not have space for the MCU yet. There are lots of rough edges, however, it is a great starting point for us to visualize our design and quantify some numbers.
Deliverables for upcoming week
We’re running a bit behind schedule, so I’ll be trying to catch us up. Primarily I will be looking to finish up our circuit design schematics, as well as iterate on the CAD design. The goal is to have the design in a modular form next week, even if the individual modules are still rough.