Status Report #3: 10/12 (Cyrus)

  • Looked at design review feedback, and started looking at more concrete metrics on NLP systems.
  • Worked on the design review document.
  • Looking into setting up time sync for our testing infrastructure.

Leave a Reply

Your email address will not be published. Required fields are marked *