This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
project [2014/09/17 16:05] yixinluo |
project [2014/10/12 15:03] yixinluo |
||
---|---|---|---|
Line 5: | Line 5: | ||
* {{18-742_f14_project_guidelines.pdf|Project Statement}} | * {{18-742_f14_project_guidelines.pdf|Project Statement}} | ||
* Literature Survey due: 9/23/2014 | * Literature Survey due: 9/23/2014 | ||
- | * Project Proposal due: 9/30/2014 | + | * Project Proposal due: 10/3/2014 |
- | * Other details are coming soon | + | * Milestone 1 due: 10/27/2014 |
+ | * Milestone 2 due: 11/17/2014 | ||
+ | * Final report due: 12/8/2014 | ||
+ | * Detailed requirements are in the project statement document above. | ||
==== Literature Survey Presentation Guidelines ==== | ==== Literature Survey Presentation Guidelines ==== |