Personal Weekly Update | Carolyn | 4/26 Accomplishments This week, I made good progress integrating Apple Watch functionality into the Cyclify app to collect real-time biometric data during cycling sessions. I encountered roadblocks in doing so, particularly with downloading the
Rita’s Status Report 4/26
Personal Weekly Update | Rita | 4/26 Accomplishments I spent this week alongside Zoe tuning the calibration algorithm and running the according tests to determine system accuracy. Once that was complete, we compiled and analyzed the data in order to
Team Status Report 4/26
Team Weekly Update | 4/26 Accomplishments This week we finished most of the final system testing, finalized our project presentation, and prepared for the upcoming demo. The pressure sensing system, BLE communication, calibration process, and app visualization are all complete
Zoe’s Status Report 4/26
Personal Weekly Update | Zoe | 4/26 Accomplishments This week I wrapped up the final data analysis and experimentation for the project. I finished the main set of slides for our final presentation, creating charts, tables, and summaries based on
Team Status Report 4/19
Team Weekly Update | 4/19 Accomplishments This week we made major progress on integrating the full sensing system onto the bike and preparing for the final presentation. Zoe completed the transition of the force sensing system onto protoboards and rewired
Zoe’s Status Report 4/19
Personal Weekly Update | Zoe | 4/19 Accomplishments This week I moved the full pressure sensing system onto protoboards to make it more durable and easier to mount on the bike. I separated the system into two boards, one for
Rita’s Status Report 4/19
Personal Weekly Update | Rita | 4/19 Accomplishments This week was spent refining the prototype given all the new sensors arrived. I attached them onto the bike, redesigned the housing a couple of times to fit all the electrical hardware
Carolyn’s Status Report 4/19
Personal Weekly Update | Carolyn | 4/19 Accomplishments This week I focused on refining some of the app’s features including calibration. I also rehashed compatibility once Zoe modified the system to using 2 muxes, and implementing more data visualization features.
Rita’s Status Report 4/12
Personal Weekly Update | Rita | 4/12 Accomplishments In between this week and the last status report, we presented to various faculty members during the interim demo. Zoe, Carolyn, and I put several hours before Carnival in order to get
Carolyn’s Status Report 4/12
Personal Weekly Update | Carolyn | 4/12 Accomplishments This week, I transitioned the app’s data layer to SwiftData, which required significant debugging and refactoring to align with new data models and persistence logic. I also integrated Swift Charts for future