Team Status Report for 4/26/2025

What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

At this point, there aren’t many major risks with the project as we’ve taken care of most of them. Remaining risks include persistent errors in the neck angle (really, head angle) calculation greater than 5 degrees past the 30-minute mark. This is being managed by additional testing after making an adjustment to one of the process noise parameters of the Kalman filter model. Unfortunately, these tests and the accompanying data processing do take a lot of time so the amount of iteration that can be feasibly done to optimize these parameters is somewhat limited. Not too concerned as current tests have yielded pretty low errors.

Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

No changes at this point!

Provide an updated schedule if changes have occurred.

Still testing and making the final adjustments for the demo 🙂 

 

Testing Pt. 2!