What are the most significant risks that could jeopardize the success of theproject? How are these risks being managed? What contingency plans are ready?
We have mainly addressed main risk from last week. We were able to solve this through the setup of the WiFi on the ESP so that we were able to free up more bandwidth for the image encoding the remote node size.
Because of this being tested and is reliable, we currently do not have any further risks. We are happy with this solution as it did not require us to reduce the image quality being sent from the camera.
Were any changes made to the existing design of the system (requirements,block diagram, system spec, etc)? Why was this change necessary, what costsĀ does the change incur, and how will these costs be mitigated going forward?
No changes