Myles’s Status Report for 2/24

Personal Accomplishments:

  • Lab Meetings (4 hrs):
    • Attended section’s Design review presentations and gave constructive feedback
  • Team Meetings (6 hrs):
    • Wrote the design review slides and finalized details for MVP
  • Research (2 hrs):
    • Looked into PWM through Arduino and found scripts to output PWM to the input pins of the h-bridge
    • Worked on a simple LED circuit to showcase PWM and the ability to raise and lower the duty cycle for the LED

Progress:

Behind Schedule – We need to change our CAD design for the carrier and track and have not made as much progress regarding propulsion. This week we worked with a cardboard prototype to see the feasibility of levitation and achieved a levitation of over an inch.  We will be doing the CAD development of the track and carrier in parallel with the H-Bridge circuit.

Next Week Deliverables:

  1. redesign track and carrier with connection grooves for increased stability
  2. Implement PWM for the input pins on the H-Bridge to create the propulsion force