This week I mostly focused on writing the design review report. I was responsible for writing the abstract, introduction, index words, summary, and project management. I was also expected to contribute to the design requirements, the design trade studies, the system implementation and the test and verification sections in the areas in which I know best about. The reason why I carried a bit more of the writing load is because I did a bit less work on the project than the others this week. In addition to that I have been working on the assembler but haven’t made too much progress. Thus far I am on schedule as my goal for the week was to write a rough draft of the design review report and to do some assembler stuff. Both of which I have done. Next week I will finish up the design review report and then hopefully start actually implementing the assembler changes