This week I worked on the slides for the design review and talked to my team and changed both the use case of our goal (from actually used to space to a museum) and discussed exactly what our presentation would include. Thus far I am on schedule as my goal for the week was to finish the design review slides and to find the I2C IP we wanted to use. Fortunately Jae had already found the I2C IP. Next week will be mostly writing the design report. I also want to read the code of the assembler we are gonna use to get more of an idea of where they are storing the code and const’s in memory and how I might be able to interact with that.