Skip to content
Team A2- The Bat-Belt

Team A2- The Bat-Belt

Wearable belt to help the visually impaired

  • Introduction
  • Design Review
  • Proposal
  • Final Report and Video
  • Weekly Updates
    • Weekly Updates-team
    • Ning Cao Updates
    • Kelton Zhang Updates
    • Xiaoran Lin Updates
  • All posts
  • Final Poster

Xiaoran Lin Updates

Here you will find a list of personal updates from Xiaoran(Alex) Lin

Xiaoran’s Status Report for 02/05/2022

Xiaoran Lin report for 2/12/2022

Alex Lin’s Status Report for 02/19/2022

Xiaoran Lin’s Status report 2/26/2022

Xiaoran Lin’s Status Report 3/19

Xiaoran Lin report 3/26

Xiaoran Lin’s Report 4/2

 

Proudly powered by WordPress